Filling craft and structure installs for our company independent innovative design, uses the great current capacity to fill installs fills the attire with the quota to complete.Fills installs the valve for the stainless aluminium casting processing,is equipped with the seal with the standard lai cirle and the guidance link,avoids between the metal rubbing,controls by the air cylinder,use stable reliable.In fills installs in the process,after the cleaning five gallons barels by transport the chain to deliver to lose the bottle screw rod,after losing the bottle screw rod separates evenly the barrel,to induct the spider,the spider inducts the barrel filling installs the system,when fills installs the air cylinder bumps into the limit switch,the air cylinder downward movement,opens fills installs the valve to start to fill the attire ,when after filling the attire finished,the air cylinder and the limit switch bump,the air cylinder upward movement,filled installs the valve closure,after filling installed five gallons barrels by the spider to derive,by transported the chain to deliver to sealing;Fills installs place is loaded with 12 to fill installs the valve continuous working to fill the attire,thus fills satisfiedly installs the speed request,simultaneously as a result of limit switch's control,achieves the fluid position to be accurate,does not spray water,does not waste the end product water,does not rise the bottle to fill superiorly installs the effect.
Capping device operates a covered storage bins,rotary-covered grounds,under the cover slot tail(based on customer needs)finished with regular water flushing devices covered.
The lid uses the stainless steel chain link to seal continuously.